Horizontal Well Drill Pipe Conveyance for Eight-sector Logging
author:admin
release time:2024-06-12
click:
On June 5, 2024, our company's Memory Cement Bond Logging Tool (MCBL)was successfully tested in a horizontal well using a drill pipe conveyance method. The well depth is nearly 5200 meters, and the logging time reached 32 hours. Data was successfully acquired.
Preparing for well entry
Logging in progress