Drill Pipe Free-Point Logging Project
author:admin
release time:2025-04-11
click:
On April 9, 2025, A-One Oil Company's the Magnetic Stuck Point Logging Tool was carried out a drill pipe stuck-pipe logging operation in a well in LvLiang, Shanxi.
The entire logging operation was completed in one go, taking a total of 6 hours. This tool accurately measured the stuck point located at a depth of 1,860m. Subsequently, the construction team carried out the cutting operation based on the measurement results and successfully resolved the issue.
Well logging site photos